India’s effort to renew its artillery began in the wake of Kargil, when the performance of 155 mm Bofors guns underscored the value of modern firepower. The programme’s long timeline reveals how hard it can be to turn a military plan into delivered equipment.

militaryIndiatechnology
XFacebook

A plan shaped by Kargil

Drafted in 1999 after the Kargil war, the Field Artillery Rationalisation Plan (FARP) aims to replace weapons across 169 Indian Army artillery regiments. The success of the 155 mm Bofors guns in service helped orient the effort toward modern weapons, predominantly of 155 mm calibre. Procurement was to combine direct imports, licensed manufacture, and systems developed within India.

The plan envisaged approximately 3,000–3,600 weapons, with an initial mix of towed, mounted, self-propelled wheeled, self-propelled tracked, and ultra-light guns. The Artillery Profile 2027, drafted in 2008, further elaborated the acquisition programme.

Building a varied arsenal

India’s towed-gun efforts include the Dhanush, developed for domestic production, and the DRDO-led ATAGS, created with industry partners. The army has also sought large numbers of towed and mounted 155 mm guns, with tenders setting requirements for range, weight, endurance, and compatibility with ammunition already in service.

For tracked artillery, India selected the K9 Vajra-T, developed in partnership with South Korea’s Hanwha and manufactured in India by Larsen & Toubro. The design was adapted for Indian conditions, including desert heat, and later underwent high-altitude trials. The ultra-light M777 followed a different path: after years of negotiations and changes to the procurement process, India ordered 145 guns, with some assembled in India.

DeepSwipe app banner

The distance between plan and reality

The programme has involved repeated approvals, trials, contracts, and production schedules. Dhanush manufacturing was interrupted by a shortage of a spare part, while early production was marked by gun-related accidents. Procurement of the M777 was postponed and restarted several times before completion in 2023.

In 2023, the Comptroller and Auditor General of India reported that just 8% of the howitzers planned for purchase had been received, and that the outcome of the remaining 77% of proposed procurement was unclear. FARP’s defining challenge is therefore not only choosing new weapons, but converting a vast modernization blueprint into equipment that reaches artillery units.

Based on Field Artillery Rationalisation Plan on Wikipedia.

XFacebook

Summarize another article

More topics in Field Artillery Rationalisation Plan

Field Artillery Rationalisation Plan - 100 Word Summary

A post-Kargil plan set out to modernise India’s artillery with thousands of new guns. Decades of procurement ambitions have met a complicated reality of trials, production delays, and limited deliveries.

militaryIndiatechnology
Read →

Kargil’s Legacy: Why India Rebuilt Its Artillery

After the Kargil war, the performance of India’s 155 mm Bofors guns helped inspire a sweeping artillery overhaul. The resulting plan sought to replace weapons across 169 regiments—and became a decades-long test of procurement and industrial capacity.

historymilitaryIndia
Read →

Dhanush: An Indigenous Howitzer’s Bumpy Start

India’s Dhanush was meant to bring domestic production into the artillery-modernisation effort, but its early years included barrel-related accidents and a pause caused by a missing spare part. Production has since restarted, with deliveries planned to continue through 2026.

technologymilitaryIndia
Read →

ATAGS: From Trials to a 307-Gun Order

Developed by India’s DRDO with Bharat Forge and Tata Advanced Systems, ATAGS moved from successful field validation toward a major procurement decision. Its path shows how testing, industrial partnerships, and government approval converge before a new gun reaches artillery units.

technologymilitaryIndia
Read →

A Tender for 1,200 Future Towed Guns

India plans to make a new 155 mm towed gun the future mainstay of its artillery, with the first tender covering 400 systems. The competition sets demanding benchmarks for mobility, range, ammunition compatibility, and long service life.

militarytechnologyIndia
Read →

K9 Vajra-T: A Korean Gun Adapted for India

India’s tracked K9 Vajra-T combines a South Korean design with extensive Indian production and modifications for desert heat. After succeeding in trials and undergoing high-altitude testing, it became a model of how imported technology can be reshaped for local conditions.

technologymilitaryIndia
Read →

M777: A Long Procurement Journey to the Mountains

India’s purchase of ultra-light M777 howitzers involved repeated postponements, restarted negotiations, and a final plan to manufacture most of the guns in India. Their later use in a border-region exercise highlights why a lighter artillery system mattered.

militaryhistorytechnology
Read →

The Gap Between Artillery Plans and Deliveries

India’s modernization blueprint counted thousands of weapons, yet an official 2023 audit found that only a small fraction of planned howitzers had arrived. The difference between procurement ambition and visible delivery is the programme’s most consequential unresolved question.

politicsmilitaryIndia
Read →